We saw a case where the owner assumed that the contractor had handled the Thames Water Build over Agreement, while the contractor assumed it was the owner. This confusion resulted in a four-week delay in the work, while location studies were conducted, plans were drawn up and Thames Water Engineer visited the website. It may be possible to use proprietary valves to avoid the need for ventilation pipes. In 2011, most of the sewers and private sewer outlets in England and Wales were transferred to public property. Thousands of kilometres of pipes – repaired and maintained by the owners (often without their knowledge) were under the jurisdiction of water companies. While this was undoubtedly good news for the owners, it created a kind of legal shade zone when these sewers were built by their former owners. Each water company has its own policy regarding the construction of public pipes or near public canals. For Severn Trent Water, if an owner wants to build in the immediate vicinity of an existing public channel, they will have followed one of the two lawsuits. Until the late 1990s, they reportedly entered into an agreement with Severn Trent Water, which stated both their rights and the rights of the water company. You may need to increase the size of your rainwater gutters and pipes or add new rainwater pipes. Information on gutter sizing and rainwater pipes can be found in approved H. Sites of rainwater pipes, sanitary apelages and external gutters may indicate where their underground sewers will be likely.
Sometimes problems arise when owners try to sell their property, which is built in part or entirely through a public channel. Conservatories and extensions are the usual criminals. If a Build Over Agreement was not obtained when the work was done, then the water company has the legal right to enter the land to reach the canal, even if that means demolishing the building above the canal. However, if possible, the water company will avoid the damage and look for other ways to enter the sewers, but the risk remains. If a construction agreement has been reached, the water company has no right to remove or demolish the structure above the sewers. All work including new foundations, foundations, stakes or basements required the approval of the water company before work began on site. In October 2011, most of the sewers and private sewers were transferred to the public domain for repair and maintenance by the local water company.
コメントをシェアしよう!